Rounding Quantities, Rates and Total allows us to make the number simpler but keeping its value close to what it was.

The Quantity , Rate and Total data can be set to the desired rounding option either in Cubit --> Options from the Job manager or using the Configuration Ribbon within the job.

It is to be noted that the Rounding option set in Cubit options will affect the new job only and the rounding option set in the Configuration Ribbon will imply only on new items created after the value is set.

To change the rounding option of items which are already inserted in the job, the rounding needs to be set in the details window.

Select the item/s for which you want to change the rounding option. In the "Details" window and using the drop down list set the desired the rounding option on Quantity or Rate.