Not planned

Changing result loses the information.

If I change a result from say volume by length to length only as a check and covert back, cubit automatically converts the trench depth and width to default setting. This is very dangerous. I would also suggest that if you have referenced something and then deleted the referenced item it should leave the value. (I had the height and width referenced in the calc sheet but its now deleted as I deleted my General Measures before issuing the BoQ for tender).

0

Comments

1 comment
  • Hello Aidan, Thank you for your valuable suggestions.

    Regarding changing the result type we advise to make a copy of the item and then change the result type, instead of changing the result type of the item in question.

    I will create a ticket for your request on references and share it with my team members.

    Thank you again for sharing your ideas and taking the time to help improve the product.

    0
    Comment actions Permalink

Please sign in to leave a comment.

Didn't find what you were looking for?

New post