Carlo Spinetti commented, Hi Theo, When you exclude a line from the total, does it also exclude the quantity? For example, if you were to switch over to the Grouped Views tab, would the quantities also reflect the exclusion?
-
Carlo Spinetti created a post, Not plannedCubit Viewer
Is there any chance that there will be a release of a Cubit Viewer platform? We have multiple Project Managers that would benefit from having access to open a Cubit file and look through the quanti...
-
Carlo Spinetti commented, I can certainly see the benefit to grouping by Quantity. I am increasingly being asked by Clients, after I have prepared my measure, to restructure my Bill to suite their Work Breakdown Structure a...
-
Carlo Spinetti commented, yup. knew this one too. we have our buildups linking back to a set of Global rates so when we need to make a change, it is a one to many relationship. Our buildups are also coded so that we can r...
-
Carlo Spinetti commented, Yep. Fully aware of the F4 feature. We ran some timing studies and it actually takes longer for the F4 command to copy down a composite than using the "Paste Column" command.
-
Carlo Spinetti created a post, Copy down rate buildups to other cells in Cubit
When do you think we will have the functionality in Cubit such that we can copy down from a cell containing a rate buildup to other cells? This functionality was available in Global and was an abs...
-
Carlo Spinetti commented, Yes indeed. This would be a great feature to have enabled. In addition, I would also suggest the functionality of being able to re-establish the links to drawings used for measuring when the fold...
-
Carlo Spinetti created a post, Missing Company Name in Cubit
Hi, When I view my BoQ it shows in the top left of the page <Buildsoft Pty Ltd> In BOQ options, I have ticked "Show Company Name" Where do I nominate my company name so that it shows instead of ...