You might be shown an error when importing a Global Job into Cubit if the first Trade row is blank.
If you receive the error below in Fig.1 when importing a Global backup job into Cubit, then this may be because the first trade line in the job is blank. See. the example is shown in Fig.2.
Fig.1 Error Message
Fig.2 Blank Line
If you import the job into Global Estimating, you will be able to transfer the job data to Cubit using the built-in transfer buttons.
Fig.3 Job Data Transfer Buttons
Should you continue to experience a problem in using Cubit/Global even after performing the above steps, please Submit a Support Ticket