Feature Availability: Cubit version 10 or earlier
You can edit group codes already inserted in Cubit Estimating instead of having to re-import. Below are the steps to add new codes and edit codes/descriptions within the existing group code file.
Adding New Code:
1. Click on the empty cell at the bottom of the code list.
2. Click on the cell to edit, and enter the new code and description as needed.
Note: When you hit enter a new cell will be automatically created for you to add more codes.
Fig.1 Add New Code
Modifying Existing code:
1. Double click on the cell (Code/Description) which needs to be modified
2. Enter the new data as required.
Fig.2 Modify Existing Code
Comments
I'm using a standalone version. If I create the Grouping Codes that I want used in the job, then give it to someone else to measure on their computer, does the export / import of the job take these Codes and their descriptions with the job, or does the someone else have to go through the creation process again?
Please sign in to leave a comment.