Job Total Calculation

Follow

In the Job Manager window, an existing or a newly imported job may not display any value in the Job Total column. 

image-0.png
Fig 1. Job without Total 

You need to open and close the job so that Cubit Estimating calculates and displays the Job Total.

image-0_-_Copy.png
Fig 2. Job with Total